Review Process
How a Content Leafcore backend architecture review runs — from scoping call to final walkthrough.
Architecture reviews at Content Leafcore follow a fixed sequence so both sides know when materials are due and when findings arrive.
- Inquiry & fit
You describe the system, the decision hanging on the review, and timing. We confirm whether the work fits our practice or should wait. - Scoping call
A 30–45 minute call locks boundaries: services in scope, interview list, deliverable date, and fee. - Materials intake
Diagrams, specs, runbooks, and access notes arrive in a shared folder. We flag gaps within two business days. - Reading & interviews
We study the design, speak with nominated stakeholders, and map failure paths across the seams you care about. - Draft for factual correction
You receive a draft brief. Comments at this stage correct facts — not tone down findings. - Final brief & walkthrough
The final document and a 90-minute walkthrough close the engagement. Office hours can extend the conversation if needed.
What you prepare
- A named decision and date
- Current context diagram (hand-drawn is fine)
- Draft or published API contracts for in-scope surfaces
- Honest list of known pain points
What we prepare
- Interview guide tailored to your seams
- Findings ranked by urgency
- Recommendations tied to the decision you named — not a generic maturity checklist
Natural next actions
Browse consultations for scope options, check fees, or send an inquiry to start the first step.